MENU CLOSE

Category / faq

    Loading posts...
  • Installation andd maintenance instructions

    installation and maintenance instruction DOWNLOAD
  • Filling joints

    stamping is the construction phase in which the technical work is completed and we go to the protection and maintenance stage WARNING: another is "do not leave a joint" and another "we…
  • Proper preparation – application

    Success loves preparation the preparation steps for the laying of our tiles are not very different from the common commercial tiles but many craftsmen express questions about various issues related to their…
  • Is the cement tile suitable for my space?

    Although we have all seen it and seen it on some old or new floor, it does not mean we are also familiar with this unique material there are 5 parameters that…
  • Specifications

    Description 2-layer cement slab a) base material 10-11 millimeters of PORTLAND 52.5 sand and cement b) surface material 3-4 millimeters of marble and cement PORTLAD 52.5 DIMENSIONS 20 x 20 cm 14mm…
  • Protection – Care – Maintenance

    Like all natural rocks and marbles, cement boards are absorbent and require the application of waterproofing materials before use it is proven that with the proper waterproofing and regular care of cement…
Translate »